Knowledge of safe and civilized production in forging plant

2022-06-20

Because of the use of a large number of toxic and harmful chemicals in the process of heat treatment production, it will also produce harmful waste gas, waste liquid and waste residue, which directly harm human health and social environment. Therefore, the implementation of safe and civilized production, promoting environmental protection, for strengthening the process and technology management of heat treatment production process, strict control of various harmful substances produced in the production process, ensure the health of production workers, protect the social environment from pollution has a very important significance.

Site civilized production requirements, good production order, clean working environment, harmonious interpersonal relationship, is to ensure the forging production activities smoothly premise, is also the three important links of civilized production.

Location management is an important link to ensure the order of production, and it is a scientific management method to analyze and study the relationship among people, things and places in the production site, so as to achieve the best combination state.

It in place on the premise of the scientific position of the object, in order to complete the medium of information system, in order to realize the effective combination of people and objects for the purpose of through to the sorting, reorganization of manufacturing, get rid of stuff you don't need in production, put the items you need in position to make it readily available, promote the civilized, scientific production management, To achieve efficient production, quality production, safe production.

The focus of location management includes the following three aspects:

1. Remove things unrelated to production

All things unrelated to production should be removed from the production site. The removal of articles that have nothing to do with production should be in line with the spirit of "double increase and double section", can change the use of change use; If it cannot be converted into capital, it may be sold off.

2. Implement the positioning according to the positioning drawing

All workshops and departments classify, move, transfer, adjust and position forgings production sites and appliances according to the requirements of the positioning drawings. Fixed objects should be consistent with the drawing, the position should be correct, placed neatly, and stored with instruments. Movable objects, such as carts and electric cars, should also be fixed to the appropriate position.

3. Place standard information badges

5, Put standard information brand to do brand, content, map consistent, set special management, not to move at will, to eye-catching and do not interfere with the production as a principle.

In short, the fixed implementation must be done: there will be a map, there will be an area, there will be listed, there will be a license classification; According to the map fixed, according to the class storage, account (map) consistent.

The following four areas shall be set up for the location management of heat treatment production site: storage area of forgings to be heat treated, storage area of forgings undergoing heat treatment, storage area of forgings after heat treatment and storage area of heat treatment defective products. The setting of each area should fully consider the configuration of equipment, logistics direction, convenient on-site operation and management, as far as possible to reduce the reverse or round-trip flow of forgings.